Drainage System Testing Glens Falls NY

Drainage pipes start from the first manhole or inspection chamber to the septic tank or sewer system in Glens Falls. After laying the pipes, before use the drains should be tested. Each section in between the manholes should be tested.

Local Companies

Pestech Exterminating Co
(845) 339-3255
309 Neversink Rd
Liberty, NY
Alexgus Removal Corp
(718) 961-4200
13849 Barclay Ave
Flushing, NY
Wahl Home Inspection Svce
(607) 732-3487
1408 Lake St
Elmira, NY
Castle Home Inspections of Ll Inc
(631) 667-4387
325 W 17th St
Deer Park, NY
World Inspection Network of Patchogue
(631) 447-0947
140 Jayne Ave
Patchogue, NY
Apple Pest Control Svcs
(631) 421-1718
879 W Jericho Tpke
Smithtown, NY
Home Inspection Associates Inc
(914) 683-0900

Great Neck, NY
Envirospect Inc
(631) 366-5294
135 W Main St
Smithtown, NY
Building Inspector of America the
(631) 758-4173
102 Camille Ln
East Patchogue, NY
James Ngai Consultants
(718) 539-7500
12027 Riviera Ct
College Point, NY

Provided By:

Author: Andrew Karundu

Drainage pipes start from the first manhole or inspection chamber to the septic tank or sewer system. After laying the pipes, before use the drains should be tested. Each section in between the manholes should be tested. Its appropriate that this is done at least twelve hours after jointing the last pipe. There are various methods of checking the system. This ensures that the system is air tight to avoid foul smells and leakages along the lines.

The testing of drainage pipes after laying commences with the following method. First the lower end of the pipe and all junctions are securely stopped. The whole length is then filled with water. After filling with water, a stopper is inserted at the top leaving a pipe attached with drain plug. This pipe is bent at ninety degrees and terminated at an elevated tank. The vertical distance of elevation should be at least one meter. This will give gravity flow.

In testing the drainage pipes, water is poured into the header tank. This is kept full for atleast three hours. It allows absorption to take place. After this time, the tank is topped up and testing commences. After a period of thirty minutes have elapsed check the water level in the tank. The water level in the header tank should not have fallen. If has dropped by there millimeters then the test is satisfactory. Give one hour and check the levels.

After testing the drain pipes and they fail the test, check the point of leakage. Its important to note that tests are run on pipes laid in trenches but are not covered. The point of leakage is then noted and fixed. This is done using a strong concrete surround with fine aggregates. A minimum cover of one hundred and fifty millimeters is done. Tests are then done again and confirmed. After passing the test, back filling is then done for the trenches.

About the Author:

Andrew Karundu Is A Building Economist, Providing Home Based Solutions To Fixing, Repairing, Remodeling And Redesigning Homes. He Uses Simple Tried And Tested Methods To Improve Family Lifestyles.Visit His Site Here For Adequate Information On Most HOME IMPROVEMENT SOLUTIONS .

Article Source: http://www.articlesbase.com/remodeling-articles/how-to-test-drainage-pipes-after-laying-1069913.html

Related Articles
- Preventing Basement Floods Glens Falls NY
If walking down to the basement leads you to a wading pool of water, you have a leak that needs fixing before more damage is done. Preventing these leaks is the best way to fight moisture in the basement. Some methods are as cheap as buying dirt and can keep you from constant cleanups or costly mold remediation.
- How to Diagnose and Clear Cloudy Swimming Pool Water Glens Falls NY
- Gutters Glens Falls NY
- Regular Roof Maintenance and Inspections Glens Falls NY
- How to Design and Install a Radiant Floor Heating System Glens Falls NY
- Growing Tomatoes Glens Falls NY
- Creating Herb Gardens Glens Falls NY
- Fixtures and Products for the Bath Glens Falls NY
- Central Heating System Glens Falls NY