Drainage System Testing Fairport NY

Drainage pipes start from the first manhole or inspection chamber to the septic tank or sewer system in Fairport. After laying the pipes, before use the drains should be tested. Each section in between the manholes should be tested.

Local Companies

Professional Finishes
585-533-9140
28 academy dr.
rochester, NY
CO9 STEEL
585 301 7724
310 angelus dr
ROCHESTER, NY
Home View Systems
(516) 541-0777
310 Bay Dr
North Massapequa, NY
National Property Inspections
(315) 735-0793

Utica, NY
Advantage Home Inspection Services
(716) 694-4192
104 Forbes Ave
Tonawanda, NY
DJM Equipment
585-223-4056
7216 Palmyra Road
Fairport, NY
LM Sanderson Construction Inc.
585 370 6076
891 Dewitt rd.
Webster, NY
Professional Home Inspections
(585) 223-4230
20 Sumac Way
Fairport, NY
Greycore Environmental
(845) 744-4848
2646 New Prospect Rd
Pine Bush, NY
Ris Home Inspections
(845) 754-7709
102 Galley Hill Rd
Cuddebackville, NY

Provided By:

Author: Andrew Karundu

Drainage pipes start from the first manhole or inspection chamber to the septic tank or sewer system. After laying the pipes, before use the drains should be tested. Each section in between the manholes should be tested. Its appropriate that this is done at least twelve hours after jointing the last pipe. There are various methods of checking the system. This ensures that the system is air tight to avoid foul smells and leakages along the lines.

The testing of drainage pipes after laying commences with the following method. First the lower end of the pipe and all junctions are securely stopped. The whole length is then filled with water. After filling with water, a stopper is inserted at the top leaving a pipe attached with drain plug. This pipe is bent at ninety degrees and terminated at an elevated tank. The vertical distance of elevation should be at least one meter. This will give gravity flow.

In testing the drainage pipes, water is poured into the header tank. This is kept full for atleast three hours. It allows absorption to take place. After this time, the tank is topped up and testing commences. After a period of thirty minutes have elapsed check the water level in the tank. The water level in the header tank should not have fallen. If has dropped by there millimeters then the test is satisfactory. Give one hour and check the levels.

After testing the drain pipes and they fail the test, check the point of leakage. Its important to note that tests are run on pipes laid in trenches but are not covered. The point of leakage is then noted and fixed. This is done using a strong concrete surround with fine aggregates. A minimum cover of one hundred and fifty millimeters is done. Tests are then done again and confirmed. After passing the test, back filling is then done for the trenches.

About the Author:

Andrew Karundu Is A Building Economist, Providing Home Based Solutions To Fixing, Repairing, Remodeling And Redesigning Homes. He Uses Simple Tried And Tested Methods To Improve Family Lifestyles.Visit His Site Here For Adequate Information On Most HOME IMPROVEMENT SOLUTIONS .

Article Source: http://www.articlesbase.com/remodeling-articles/how-to-test-drainage-pipes-after-laying-1069913.html

Related Articles
- Central Heating System Fairport NY
Central heating is very different from local heating in the way heat is generated. In central heating, heat generation occurs in one place, such as a furnace room in a house or a mechanical room in a large building through the combustion of fossil fuel in a furnace or boiler.
- Fixtures and Products for the Bath Fairport NY
- Gutters Fairport NY
- How to Diagnose and Clear Cloudy Swimming Pool Water Fairport NY
- Growing Tomatoes Fairport NY
- How to Design and Install a Radiant Floor Heating System Fairport NY
- Creating Herb Gardens Fairport NY
- Regular Roof Maintenance and Inspections Fairport NY
- Preventing Basement Floods Fairport NY