Drainage System Testing East Aurora NY

Drainage pipes start from the first manhole or inspection chamber to the septic tank or sewer system in East Aurora. After laying the pipes, before use the drains should be tested. Each section in between the manholes should be tested.

Local Companies

Trautman Associates
(716) 883-4400
470 Franklin St.
Buffalo, NY
Balvac, Inc.
(716) 655-5981
470 Buffalo Rd.
East Aurora, NY
MVK International Corp.
(716) 895-8569
152 Halston Pkwy.
East Amherst, NY
Charles Stancampiano Construction
(716) 631-0702
5 Hobnail Dr.
East Amherst, NY
Sealmaster/Buffalo - Jet Black Sealers, Inc.
(716) 891-4197
555 Ludwig Ave.
Buffalo, NY
"C" Concrete inc
716 570 1905
4347 broadway
Depew, NY
T & D Ceramics
(716) 894-9209
2133 Broadway
Cheektowaga, NY
Allgaier Construction Corp.
(716) 633-7350
4790 Thompson Rd.
Clarence, NY
Patrick N. Marsillo Home Repairs
(716) 649-0382
4909 Bayview Rd.
Hamburg, NY
Holiday Lumber Co.
(716) 863-6338
22 Sussex Ln.
Lancaster, NY

Provided By:

Author: Andrew Karundu

Drainage pipes start from the first manhole or inspection chamber to the septic tank or sewer system. After laying the pipes, before use the drains should be tested. Each section in between the manholes should be tested. Its appropriate that this is done at least twelve hours after jointing the last pipe. There are various methods of checking the system. This ensures that the system is air tight to avoid foul smells and leakages along the lines.

The testing of drainage pipes after laying commences with the following method. First the lower end of the pipe and all junctions are securely stopped. The whole length is then filled with water. After filling with water, a stopper is inserted at the top leaving a pipe attached with drain plug. This pipe is bent at ninety degrees and terminated at an elevated tank. The vertical distance of elevation should be at least one meter. This will give gravity flow.

In testing the drainage pipes, water is poured into the header tank. This is kept full for atleast three hours. It allows absorption to take place. After this time, the tank is topped up and testing commences. After a period of thirty minutes have elapsed check the water level in the tank. The water level in the header tank should not have fallen. If has dropped by there millimeters then the test is satisfactory. Give one hour and check the levels.

After testing the drain pipes and they fail the test, check the point of leakage. Its important to note that tests are run on pipes laid in trenches but are not covered. The point of leakage is then noted and fixed. This is done using a strong concrete surround with fine aggregates. A minimum cover of one hundred and fifty millimeters is done. Tests are then done again and confirmed. After passing the test, back filling is then done for the trenches.

About the Author:

Andrew Karundu Is A Building Economist, Providing Home Based Solutions To Fixing, Repairing, Remodeling And Redesigning Homes. He Uses Simple Tried And Tested Methods To Improve Family Lifestyles.Visit His Site Here For Adequate Information On Most HOME IMPROVEMENT SOLUTIONS .

Article Source: http://www.articlesbase.com/remodeling-articles/how-to-test-drainage-pipes-after-laying-1069913.html

Related Articles
- Preventing Basement Floods East Aurora NY
If walking down to the basement leads you to a wading pool of water, you have a leak that needs fixing before more damage is done. Preventing these leaks is the best way to fight moisture in the basement. Some methods are as cheap as buying dirt and can keep you from constant cleanups or costly mold remediation.
- Growing Tomatoes East Aurora NY
- Central Heating System East Aurora NY
- Fixtures and Products for the Bath East Aurora NY
- How to Diagnose and Clear Cloudy Swimming Pool Water East Aurora NY
- How to Design and Install a Radiant Floor Heating System East Aurora NY
- Gutters East Aurora NY
- Creating Herb Gardens East Aurora NY
- Regular Roof Maintenance and Inspections East Aurora NY